“Schwabenhaus” is based on geothermal energy near the surface
Use of the GeoCollect system for energy recovery from wastewater
On May 4, 2015, the groundbreaking began. In 4 days, 3 trenches with a length of 5.5 m and a trench with a length of approx. 10.5 m were lifted. A total of 5 strands of a ’10 absorber modules were introduced into the trenches for 5 kW extraction capacity.
Start of assembly and alignment of the absorbers in the trenches, including the laying of the wastewater pipe between the absorbers. The pictures on the left and on the right show three connected substrands.
The complete construction site documentation can be downloaded from the Internet.
Contact us! We are available for you from 8 am to 5 pm.
040 2263306 10
The team of GeoCollect GmbH